Expert leadwork across Lechlade and surrounding areas. Lechlade is 14 miles from our Swindon base. Free quotes, 10-year guarantee, no call-out fees.
Lechlade is 14 miles from our Swindon base. The Thames confluence floodplain at 75m creates specific conditions that affect leadwork work here. The Oak Street mixed housing represent the bulk of our post-war work, while the Cotswold stone town centre require specialist knowledge of traditional materials and techniques. We carry the right materials for both property types and switch between modern and period specifications daily.
At Thames confluence floodplain at 75m, Lechlade faces specific challenges that generic specifications do not account for. Wind loading, humidity levels, temperature ranges and frost frequency all differ from sheltered Swindon. Every leadwork specification we write for Lechlade accounts for these local conditions. The Oak Street mixed housing see the bulk of our standard work, while the Cotswold stone town centre need conservation-grade materials and techniques.
We survey from the roof, not just the ground. We photograph everything and explain what we find in plain English. We quote in writing with itemised costs and no hidden extras. We use the correct materials for the property type and local conditions. We do not subcontract. Every job carries our written 10-year workmanship guarantee. Call 0179 329 7084 for a free survey.
We use materials appropriate to Lechlade's conditions and property types. For the Oak Street mixed housing, we use modern high-performance materials with enhanced specifications where the local exposure demands it. For the Cotswold stone town centre, we use period-appropriate materials including lime mortar, reclaimed tiles and traditional lead dressing. All fixings are stainless steel or copper. We never compromise on specification because a cheap job that fails reflects on our reputation.
Free quotes. No call-out fee. Call 0179 329 7084.
0179 329 7084"Excellent leadwork work on our property. Professional, punctual and fairly priced. The team knew exactly what they were doing and left the site spotless."
"Called for a free quote and they were thorough and honest. Explained everything clearly, no pressure, competitive price. The work itself was done to a high standard. Would recommend."
"Quick response, honest assessment, clean work. They used the right materials for our property type and the result speaks for itself. Ten-year guarantee gives real confidence."
£200–£500 for basic work. Free quotes with no call-out fee for all Lechlade properties. We use code 4 milled lead (1.80mm, BS EN 12588) — the correct specification for Swindon's exposure. Hand-dressed with traditional techniques for 30–50 year lifespan. See our leadwork service page.
Yes. Lechlade is 14 miles from our Swindon base. We provide full leadwork services across Lechlade and surrounding areas. We use code 4 milled lead (1.80mm, BS EN 12588) — the correct specification for Swindon's exposure. Hand-dressed with traditional techniques for 30–50 year lifespan. See our leadwork service page.
Lechlade's Thames confluence floodplain at 75m creates specific conditions that affect leadwork work. The Oak Street mixed housing and Cotswold stone town centre each present different challenges that we address with location-appropriate specifications. We use code 4 milled lead (1.80mm, BS EN 12588) — the correct specification for Swindon's exposure. Hand-dressed with traditional techniques for 30–50 year lifespan. See our leadwork service page.
Lechlade is 14 miles from our base. We can typically be on site within 30-45 minutes for standard appointments and faster for emergencies. We use code 4 milled lead (1.80mm, BS EN 12588) — the correct specification for Swindon's exposure. Hand-dressed with traditional techniques for 30–50 year lifespan. See our leadwork service page.
Yes. NFRC registered, £5m public liability insurance, and every job carries our written 10-year workmanship guarantee. We use code 4 milled lead (1.80mm, BS EN 12588) — the correct specification for Swindon's exposure. Hand-dressed with traditional techniques for 30–50 year lifespan. See our leadwork service page.
Yes. Free, no-obligation quotes for all leadwork work in Lechlade. We inspect, photograph and explain what we find before quoting. We use code 4 milled lead (1.80mm, BS EN 12588) — the correct specification for Swindon's exposure. Hand-dressed with traditional techniques for 30–50 year lifespan. See our leadwork service page.
We use the correct materials for each property type and location. For Lechlade's Cotswold stone town centre, we use period-appropriate specifications. For the Oak Street mixed housing, we use modern high-performance materials. Every specification accounts for Lechlade's Thames confluence floodplain at 75m. We use code 4 milled lead (1.80mm, BS EN 12588) — the correct specification for Swindon's exposure. Hand-dressed with traditional techniques for 30–50 year lifespan. See our leadwork service page.
Lead sheet is graded by code number indicating thickness. Code 3 (1.32mm) is too thin for external roofing in Swindon conditions — it fatigues quickly from thermal cycling. Code 4 (1.80mm) is the standard specification for flashings, valleys and flat areas — the right balance of durability and workability. Code 5 (2.24mm) is used for exposed positions with extreme wind loading or areas subject to foot traffic. Code 6 and above are specialist applications. We use code 4 as standard on all Swindon work and upgrade to code 5 only where the exposure genuinely demands it.
Lead roofing is a craft skill that requires understanding of how the material behaves. Lead is bossed — shaped by hammering over a form — rather than folded sharply, which creates stress points that crack over time. Joints between sheets use welted seams — interlocking folds that create a mechanical waterproof bond without solder, which cracks from thermal movement. Each sheet is limited to 1.5m maximum in any direction to control thermal expansion. These techniques have been used for centuries because they work. Modern sealants and adhesives supplement but do not replace traditional lead dressing.
Lechlade sits at the confluence of the Thames, Leach and Cole rivers at just 75m elevation. This is arguably the dampest location in our entire coverage area. The flat floodplain position creates persistent humidity year-round, with morning mist frequent from September through May. Every roof surface — tiles, mortar, lead, timber — stays wet for longer here than anywhere else we cover. Cotswold stone tile maintenance is a particular challenge because the limestone absorbs moisture that then freezes and causes surface spalling. We recommend annual inspection and proactive biocide treatment for all Lechlade properties as standard.
Lead roofing is valuable scrap metal and unfortunately a target for theft, particularly on unoccupied or secluded properties. There are several deterrent options we can advise on. SmartWater or SelectaDNA forensic marking makes stolen lead traceable. Tamper-evident fasteners on accessible lead flashings alert you to interference. Lead substitute products like Ubiflex provide a non-metal alternative for lower-risk areas while maintaining waterproof performance. For high-risk locations, we can specify lead-effect GRP that looks identical to lead but has no scrap value. We advise on the appropriate level of protection for each installation based on the property location and visibility.
Not every lead flashing problem requires complete replacement. A hairline crack at a single fold line can be repaired with a patch of matching lead dressed over the crack and sealed with compatible sealant. A lifted edge where the pointing has failed can be re-dressed and re-pointed without removing the existing lead. However, if the lead is cracked at multiple points, if it has become paper-thin from corrosion, if the original dressing was poor and water is getting behind the lead rather than over it, or if the lead has been patched repeatedly already, replacement is the better investment. New code 4 lead properly dressed will last 30-40 years. Repeated patching of deteriorated lead is money wasted on a material that has reached the end of its useful life. We assess honestly and recommend accordingly.
We use only BBA-certified milled lead sheet from established manufacturers — Midland Lead, Associated Lead Mills or equivalent. Milled lead has a consistent thickness and grain structure that ensures predictable thermal behaviour and long service life. We do not use cast lead or recycled lead sheet of uncertain provenance. Every piece of lead we install is traceable to its manufacturer, certified to BS EN 12588, and stamped with its code weight. This traceability matters for insurance purposes, for conservation area compliance, and for your confidence that the material will perform as specified for its full 30 to 50 year expected lifespan.
From £150, no call-out fee.
More →Full re-roofs, 10yr guarantee.
More →GRP/EPDM, 25yr guarantees.
More →Same-day 24/7 response.
Call Now →Cleaning, repairs, replacement.
More →Repointing, flashings, stacks.
More →Biocide, 3-5yr protection.
More →uPVC roofline, ventilation.
More →Fitted to your roof.
More →Code 4 flashings, valleys.
More →Repair, matching, re-roofing.
More →Surveys from £120, fee credited.
More →Here is how to tell if this is the right service for your property.
When it is not the answer: Minor surface oxidation on lead is normal and protective. Replacement is only needed when the lead has cracked, split or lifted from its fixing.
Assess lead condition, chase integrity, substrate.
Code 4 for flashings, Code 5 for valleys and gutters.
Bossing, welding, dressing into chase, flexible sealant.
Oil finish to prevent staining on light masonry.
| Job | Duration |
|---|---|
| Flashing replacement | Half day |
| Valley re-lining | 1-2 days |
| Bay top | 1 day |
Weather dependent.
Depends on location — ladder for low-level, scaffold for chimneys and high junctions.
Thames-side town 15 miles east. Cotswold stone properties with stone slate roofs. Pavement scaffold and skip permits go through Swindon Borough Council; allow a few working days on streets like Burford Street, High Street, Oak Street.
Workmanship 10 years. Lead lifespan 30-50 years.
Minimal — typically half a day to a day.
Lead work runs year-round. Cold lead is harder to dress — we allow extra time in winter. Thames valley humidity plus Cotswold exposure — moss thrives on stone slate.
Last updated: August 2026
Trusted leadwork covering Lechlade. No obligation.
0179 329 7084